Compare kitchen quotes, line by line
A cabinet schedule is not necessarily a quote for a finished kitchen. A supplier might include units and delivery but no installation. A fitter may assume walls, floors, wiring and plumbing are already ready. Both documents can be accurate while leaving you to organise substantial work between them.
Begin with one dated layout and a product list. Give every trader the same cabinet arrangement, appliance models, worktop choice and finish requirements. Where a trader proposes a different material or layout, label it as an alternative rather than comparing it as though nothing changed.
Trade handovers deserve particular attention. Someone must check deliveries, manage missing parts, prepare services and return after the worktop is measured. The quote should assign those tasks clearly. Otherwise the apparent saving may become extra appointments, disruption or unpriced work you discover during installation.
At a glance: what to check in a kitchen quote
- WorktopsTemplating, cut-outs, fitting
- AppliancesSupplied, fitted or neither
- PlumbingSink, dishwasher, washer
- ElectricsNew circuits and certificate
- Old kitchen removalStrip-out and disposal
- Room preparationWalls, floor and ceiling
What a complete kitchen quote should include
- Layout revision — Use the same dated plan for every quote, including cabinet sizes, appliance positions, clearances and any island or breakfast bar.
- Cabinet specification — Record carcass construction, door finish, drawer systems, hinges, end panels and internal fittings rather than relying on a range name.
- Supply and installation — Separate goods from fitting. Identify homeowner-purchased items and check who is responsible for compatibility and missing installation accessories.
- Worktops — Include material, thickness, edges, joints, cut-outs, upstands, templating and installation. Clarify return visits and any required supports.
- Appliances — List chosen model references, delivery, installation, connections and disposal of old equipment. Confirm whether connection materials are supplied.
- Old kitchen removal — Specify removal of units, worktops and agreed finishes, including waste disposal and protection for items you intend to keep.
- Plumbing — Identify sink and appliance connections, service relocations, isolation valves and the making good around altered pipe routes.
- Electrics — Describe sockets, lighting and appliance circuits. Allocate testing, certification and any likely notifiable work to the appropriate professional.
- Extraction — Include the hood, duct route, external outlet and making good. Supplying an extractor is not the same as installing suitable ducting.
- Room preparation — State plaster repairs, floor preparation, tiling, splashbacks and decorating. Agree what standard the room must reach before fitting starts.
- Delivery and storage — Allocate unloading, checking damaged goods, storage and replacement orders so delays do not become an unexplained dispute between supplier and fitter.
- Programme and snagging — Set out sequencing, loss of cooking facilities, return visits and responsibility for resolving supplier faults versus installation defects.
What's often left out — and what it can cost
A budget flat-pack kitchen and a bespoke kitchen are not identical projects. The references below distinguish broad specifications and example room sizes. Use the category closest to the actual units and worktops, not the most attractive marketing label.
These figures describe supply-and-fit kitchen refits. They do not provide individual prices for a worktop cut-out, plaster repair, appliance connection or skip. Where those items are excluded, obtain a project-specific price from whoever will carry them out.
Whole-job and per-area references are alternative ways to describe a kitchen, not costs to add together. Floor area alone cannot capture cabinet count, appliance choices or complicated worktop joints. Check the proposed finished room before treating a range as comparable.
Typical UK cost: kitchen
Budget kitchen: £9,000 to £12,000. Mid-range kitchen: £18,000 to £24,000. High-end kitchen: £45,000 to £60,000
Budget kitchen: £9,000 – £12,000 for the job
Kitchen refit, budget (flat-pack, laminate worktop, about 10 m²) · Whole job. BestBuilders kitchen refit guide · Aug 2026. Broad UK guide, treated as VAT-inclusive; not a trader quote.
Mid-range kitchen: £18,000 – £24,000 for the job
Kitchen refit, mid-range (rigid units, quartz, about 11 m²) · Whole job. BestBuilders kitchen refit guide · Aug 2026. Broad UK guide, treated as VAT-inclusive; not a trader quote.
High-end kitchen: £45,000 – £60,000 for the job
Kitchen refit, high-end (bespoke, natural stone, about 14 m²) · Whole job. BestBuilders kitchen refit guide · Aug 2026. Broad UK guide, treated as VAT-inclusive; not a trader quote.
The cheapest quote isn’t always the cheapest job
IllustrativeQuote A: quoted £21,500, estimated missing work £0 to £0, likely total £21,500. Worktops and electrics included. Quote B: quoted £18,900, estimated missing work £2,400 to £3,800, likely total £21,300 – £22,700. Worktop templating and electrics extra.
An illustrative kitchen comparison
Illustrative example, not a real customer report.
| Work item | Quote A | Quote B | Quote C |
|---|---|---|---|
| Cabinet supply and fitting | |||
| Worktop templating | |||
| Appliance connections | |||
| Wall preparation | |||
| Old kitchen disposal | |||
| Painting |
A disposal-inclusive quote is not automatically the most complete. Compare the service connections and wall preparation too. Resolve the handovers between the supplier, installer and other trades against the finished kitchen you actually want.
Questions to ask each trader
- Are you quoting from this exact plan and product list, with any substitutions shown separately?
- Who arranges worktop templating, supports, installation and any return visits?
- Which plumbing, electrical and extraction alterations are included, with testing and making good?
- Does the total include VAT on supply, fitting and separately arranged services?
- What does the deposit fund, and how are later payments linked to delivery or completed work?
- Who resolves damaged goods, missing parts and installation snagging?
Your kitchen questions
Is a showroom quotation enough?
Check its limits. Delivery, fitting, services and room finishes may sit outside the supply quote. Compare the combined project while keeping each business’s contract and responsibility clear.
Can I compare stone and laminate worktops?
Yes, as alternatives. Note the effect on templating, fitting, supports and maintenance. Ask for the price effect without changing unrelated cabinet or appliance selections.
What if appliances are an allowance?
Ask which products the figure covers and whether installation is included. Obtain an updated total once you choose models; an allowance does not guarantee your preferred products fit it.
Can I upload a PDF and an email?
Yes. Upload the PDF and paste the email text into separate quote entries. Include schedules and exclusions so the comparison does not mistake an absent page for absent work.
Ask all suppliers and fitters to price one kitchen specification. Confirm exclusions and unresolved selections in writing before ordering, so the installation plan has no unnoticed gaps between trades.
Free preview of 2 quotes. No sign-up needed to start.
Related
Latest guides
All guidesHow to Compare Contractor Estimates Without Choosing the Cheapest Quote
Learn how to compare contractor estimates fairly, identify hidden costs, check exclusions and choose the best-value quote for your home project.
Read postQuote or estimate? What the difference means for your home job
Quote, estimate or provisional sum? Learn what each word means on a UK trader's price, how it affects your final bill and what to ask before you agree.
Read postHow to compare builder quotes: a line-by-line guide
Learn how to compare builder quotes like for like: spot exclusions, match VAT and ask the right questions before you pay a deposit. Checklist inside.
Read post