How long is a builder's quote valid? What to check and do

Ashraf Hussan Babor · Founder, ScopeCheck

Published 30 October 2026 · Updated 30 October 2026

How long is a builder's quote valid? What to check and do, ScopeCheck guide

Typically, a builder's quote is valid for a limited period, but there is no single fixed answer. So how long is a builder's quote valid? It is whatever the quote says. If the document shows no date, you need to ask. Validity periods vary from builder to builder, so do not assume a standard length.

What matters for you is knowing the date, comparing quotes fairly when their dates differ, and getting any change in writing. This guide covers where to find the expiry date, what to do if it is close or has passed, and how it differs from price rises after you accept. It is a general guide, not legal or financial advice.

How long is a builder's quote valid? The short answer

There is no single period that applies to every quote. Citizens Advice says a quote should state how long the price is valid, whether the price includes VAT, and when the price can go up. For example, the price might rise only if you agree to extra work or extra material costs.

In practice:

Citizens Advice also advises getting quotes in writing rather than relying on a verbal quote. A verbal price with no date leaves you with very little to rely on.

For your rights in a specific situation, check Citizens Advice or take advice from a qualified professional.

Why builders put an expiry date on a quote

An expiry date is usually a practical safeguard, not a sales tactic. Builders are pricing a defined piece of work at a particular point in time, and several things can shift while you think it over:

An expiry date also helps you. It tells you when the price is firm and when you need to check again. A quote with a clear date is easier to rely on and easier to compare than one that says nothing.

Many builders who set a validity period are not trying to rush anyone. The problem comes when a short deadline is used as pressure, which is covered below.

Where to find how long a builder's quote is valid (and what vague wording means)

Validity wording is often small and easy to miss. Check these places:

"Valid for 30 days" vs "valid until [date]"

"Valid for 30 days" sounds clear, but it raises questions. Does the clock start on the date written on the quote, the date it was emailed, or the date you received it? If the quote was prepared on the 1st and sent on the 10th, you could lose nine days without realising.

"Valid until 14 March" removes that doubt. A specific date is easier to put in a diary and easier to compare across several quotes. If a quote only gives a number of days, ask the builder to confirm the exact end date.

Wording to query

Once a quote has lapsed, the price may no longer be firm, so it helps to know which kind of document you hold. Citizens Advice describes a quote as a promise to do work at an agreed price, and an estimate as the trader's best guess. If you are unsure which one you hold, read the difference between a quote and an estimate.

Quote expiry vs price rises after you accept: what is different

These are two separate situations, and they are easy to confuse.

1. Before you accept. The quote is an offer with a time limit. If the date passes, the builder may withdraw it, re-quote at a different price or decline the job. That is the main risk of an expired quote.

2. After you accept a fixed-price quote. The position changes. Citizens Advice says that if you have a quote, the trader can't charge more than quoted unless there is a good reason, and they can't charge more just because their costs have gone up since they gave the quote. A good reason could be extra work that you agreed to.

So the validity date is about how long you have to accept. It is not a general licence for the builder to increase the price later. How this applies to your contract depends on what was agreed, so check Citizens Advice or take professional advice if there is a dispute.

A few practical points follow from this:

What to do if your quote is about to expire (or already has)

If the date is close or has passed, you do not have to accept on the spot. A short, written approach usually works best.

1. Ask the builder to extend the date or confirm the price still holds. Keep it simple: "Our quote dated [date] was valid until [date]. Could you confirm whether the price still stands, or extend it to [new date]?" This is also how to ask a builder to extend quote validity without any awkwardness. 2. Ask what has changed, if anything. If the price is going up, ask which lines are affected and whether the driver is materials, labour or something else. 3. Request a revised written quote. It should carry a new issue date and a new valid-until date. If possible, ask the builder to mark the changed lines so you can see exactly what moved. 4. Check the scope is unchanged. A revised price sometimes comes with a revised specification. Make sure you are not comparing different work. 5. Do not pay a deposit just to lock the price. If the only reason to pay now is to beat a deadline, step back. Coventry City Council's building control advice includes getting a written contract and not paying in advance. For what is reasonable, see how much deposit a builder should ask for.

If a builder says an expired quote now costs more, that is not automatically unreasonable. Material and labour costs do change. What you should expect is a clear, written explanation and enough time to compare it with your other options.

How to compare quotes that expire on different dates

Quotes rarely arrive on the same day, so their expiry dates rarely match. A cheaper quote that expires next week and a slightly dearer one that holds for two months are not like-for-like. Neither is a quote whose price is held only until a date before the builder can actually start.

A simple comparison table helps. Fill one in for each quote:

What to recordQuote AQuote BQuote C
Date issued
Valid-until date (exact)
Start date offered
Does the price hold until the start date?
Materials specification assumed
Provisional sums included
VAT included or excluded
Conditions on price changes

Then compare line by line. Dorset Council advises asking at least three builders to provide quotes and sending each of them the same full set of detailed drawings, if you have them. Coventry City Council also lists getting at least 3 quotations among its advice. Giving every builder the same information makes the dates and prices much easier to compare fairly.

Also bear in mind that Citizens Advice suggests being cautious if the price is a lot lower than other quotes you get. A low price with a short expiry and thin wording may be missing items rather than being a bargain.

For a fuller method, see how to compare builder quotes properly.

If reading several quotes side by side is a struggle, ScopeCheck compares 2 to 5 builder or trade quotes line by line, so you can see what is included, what is missing and where the prices really differ. It compares quotation wording only. It does not inspect work, value property or give legal or financial advice, and it does not recommend or rank specific traders.

Timing your quotes so the price is still valid when you decide

A little planning at the start can avoid most expiry problems.

This is cautious, general advice based on common industry practice. Every project differs, so adapt it to your timetable and the scale of the work.

Frequently asked questions

How long is a builder's quote usually valid for in the UK?

There is no single fixed period. It varies from builder to builder, but the quote itself should say. Citizens Advice says a quote should state how long the price is valid.

What if my builder's quote has no expiry date?

Ask the builder to confirm the validity period in writing, ideally as an exact date. Having it in an email or on a revised quote gives you something clear to refer back to.

Can a builder put the price up after the quote has expired?

Once a quote has lapsed, the builder may re-quote, and the new price may reflect changed costs or availability. Ask for the reasons and a revised written quote before deciding. For your rights in a particular case, check with Citizens Advice.

Can I ask a builder to extend the validity of a quote?

Yes, and it is reasonable to ask, ideally before the date passes. Request a revised date in writing, and ask for confirmation that the scope and price are otherwise unchanged.

Can a builder increase the price after I have accepted the quote?

Citizens Advice says that with a quote, the trader can't charge more than quoted unless there is a good reason, and can't charge more just because their costs have gone up. Extra work you have agreed to can be a good reason, so keep any changes in writing.

Next step

Before an expiry date forces your hand, put your quotes side by side with their dates, scope and exclusions. If you would like help with that, you can compare your builder quotes line by line and see what is included, what is missing and where the prices differ. There is a free preview for 2 quotes. Compare the work, not just the price.